Level Best Contracting Blog ·

Why a Small Bathroom Remodel Costs So Much Per Square Foot

The New York Times recently ran Bathrooms Are Getting Bigger and Better, which reports that bathroom renovations can take more time and money than work in other rooms of the house. Homeowners ask us about this all the time. Why does a room that small price out like a much bigger project? Here are the questions that come up most.

Why does such a small room cost so much per square foot?

Because everything happens in the same few feet. A kitchen spreads its work across cabinets, counters and flooring. A bathroom needs a plumber, an electrician, a tile setter, a carpenter, a drywall finisher and a painter, often a glass installer too. They work one after another in a room where two people can barely stand side by side.

Then there's the work you'll never see. Behind the tile is a waterproofing system, and behind that are supply lines, drains, framing and an exhaust fan duct that has to go somewhere. Most tile and grout isn't waterproof on its own. The layer behind it is what keeps water out of your walls and subfloor, and it takes real labor to install correctly. That labor doesn't shrink because the room does.

Fixtures work the same way. A vanity, a toilet, a shower valve and a fan cost roughly the same in a small bathroom as in a large one. Spread that over less floor and the per-square-foot figure looks steep. It isn't a rip-off. It's arithmetic.

How long does a bathroom remodel take?

It depends on scope, and anyone who quotes a number before seeing the room is guessing. A straightforward update goes much faster than a full remodel with a custom tile shower and moved plumbing. The delays usually hide outside the work itself.

Before demolition, there's permit review if your town requires a permit, and special-order items. Vanities, fixtures and custom glass can add weeks of lead time. Order early, and confirm things have shipped before anything gets torn out.

During the job, inspections follow the town's calendar, so the schedule bends around the inspector's availability. Waterproofing and setting materials need time before the next step, and rushing them is how showers leak a couple of years later.

Ask for a written schedule that shows these waiting periods. A good one has gaps in it, and that's honest.

Before demolitionDuring the jobPermit reviewif requiredSpecial-orderlead timeInspectionstown's calendarWaterproofingand setting timeAsk for a written schedule that shows these waiting periods
Where the waiting usually hides in a bathroom remodel.

Should I make the bathroom bigger?

Sometimes. Borrowing space from an adjoining closet or hallway makes sense when the room doesn't function, like a shower you can't turn around in or a door that hits the toilet. There, the extra square footage fixes a daily problem.

It makes less sense when the goal is just "more." Moving a wall means finding out what's inside it. In an older home, a neighboring wall can hold plumbing, ductwork, wiring or structure, and each one adds cost before you've bought a single tile. Relocating the toilet or shower drain is another jump, because it means opening the floor.

My rule: keep the layout if it works and put the savings into what's behind the walls. Change it if the room fails you every morning. Tub-to-shower conversions are a good middle path, and we do a lot of them. A walk-in shower with a low or no curb can make a room feel more open without moving a wall. Drain location and wall framing decide what's possible, so someone has to look before you commit.

Where should I spend, and where can I save?

Spend on the parts you can't easily replace: the waterproofing, a quality shower valve, and an exhaust fan that's sized properly and vents outside. A weak fan is a slow moisture problem. A cheap valve means cutting into a finished tile wall to fix it.

Save on what you can swap in an afternoon. Faucets, mirrors, light fixtures, towel bars and cabinet hardware can all be upgraded later. Tile falls in between. Plain tile installed well beats expensive tile installed badly, and intricate patterns add labor you pay for by the hour.

What should I ask a contractor before signing?

  1. Who pulls the permit? Requirements vary by village and city, so ask what your town requires for this scope and get the answer in writing.
  2. What do the allowances cover? If the estimate carries a line for tile or fixtures, find out what that money buys and what happens if you pick something pricier.
  3. How do change orders work? Surprises behind walls happen, especially in older homes. You want a price and your signature before extra work starts, not a bill afterward.
  4. What waterproofing system is going in, and who looks at it before tile goes on?
  5. Which items are special order, and when will they be ordered?

Before you call anyone, stand in your bathroom and write down what annoys you. Then sort the list into things that need a wall moved and things that don't. That one page makes every estimate easier to compare.

Planning a project?

Tell us what you have in mind. We work across Cook, DuPage, Kane and Lake counties and give straight answers on scope, timeline and budget.

Request a Free Estimate